Project Details

The project involved the renovation of the 4th floor at Acera Office, including the development of a test-fit plan to optimize space layout and functionality. Our team collaborated closely with mechanical and electrical engineering consultants to ensure all systems were fully integrated and compliant with building standards. A base building review was conducted to align the new design with the existing infrastructure.
T.i. STUDIOS served as the architectural prime consultant, providing a full scope of services including pre-design and due diligence, schematic design, design development, permitting, bidding and negotiations, construction documents, construction administration, interior design, and post-construction support. The interior design focused on creating a cohesive and functional environment that meets the client's operational needs while enhancing the overall aesthetic of the space.

Services Provided

    Construction Admin Management

    Project Management,

    Architectural Prime Consultant

    Interior Design

    Permitting and Approvals

  • STATUS

    Complete

  • LOCATION

    Calgary, AB

  • YEAR

    Q4 2025

  • BUDGET

    ?

  • AREA

    11,700 Sq Ft

  • TIMELINE

    8 months