ALBERTA E-HOUSE
Developed by T.i. STUDIOS Architecture, the facility serves as a hub for the design, engineering, procurement, installation, and commissioning of modular E-Houses. These prefabricated electrical buildings are integral to various sectors, including petrochemical industries, offering efficient solutions for housing electrical equipment. The design emphasizes functionality and adaptability, accommodating the complex requirements of industrial electrical systems while promoting sustainability through modular construction.
CONSTRUCTION COMPLETION: 2015
PROJECT LOCATION: Calgary, AB
PROJECT BUDGET: $18M
TOTAL CONSTRUCTION AREA: 60,000 sq.ft.
CONSTRUCTION TIMELINE: 15 months
PROJECT TYPOLOGY: Base Build
ASSET CLASS: Industrial
T.i. STUDIOS CONTRACT: RAIC Doc 6
DELIVERY METHOD: Design-Build